We always carry out the details of the project step by step and in consultation with supervising engineers and are expert in observing the following subtle points:
In the fittings of the piping system and the metal piping system, the use of suitable sealing oringes, the protection of pipes against building materials, observing the care points during the construction of the piping (due to the synchrony of other construction operations), the non-placement of polymer pipe rolls on the building floor directly and inserting a separator or retainer to protect against possible damage, clearing the plumbing path from different building materials of sharp casings (polymer pipes), testing and approval of the supervisor engineer after running each piping path and using light mortar to cover the circuit and protect against possible damage, care of pipes or foam pipes Polymers in direct sunlight, care not to exert extra weight on installed pipes, care of unburied pipes and discharging circuits in winter, preliminary and final tests of piping systems and noticeable points after testing and commissioning such as gradual increase in temperature of water entering the heating system.